Slope Improvement and Emergency Works over Tuen Mun, Yuen Long, North, Tai Po and Shatin Districts
1/LANDS/25
Adrian Construction Limited
Unconfirmed
64,940,000
Verified
Not found
—
Award date unconfirmed — LandsD works-contract page publishes no award-date column; top of FY2025 sequence, WebSearch found no dated press release. Landslip vertical — slope-works keyword = HIGH relevance regardless of value. Verify exact award date before outreach.
DRAFT REVIEW
Lands Department
Lands Dept Term Contract — Demolition of Buildings/Structures and Clearance/Maintenance of Land, 2026-2027
11/LANDS/25
Wah Seng General Contractors Limited
Unconfirmed
19,020,000
Verified
Not found
—
Award date unconfirmed — LandsD works-contract page has no award-date column (see 1/LANDS/25). Term demolition/clearance contract. [Below DEVB Threshold]
DRAFT REVIEW
Lands Department
Lands Dept Term Contract — Demolition of Buildings/Structures and Clearance/Maintenance of Land, 2026-2027
12/LANDS/25
Yu Wing Construction & Investment Company Limited
Unconfirmed
17,406,000
Verified
Not found
—
Award date unconfirmed — LandsD works-contract page has no award-date column (see 1/LANDS/25). Term demolition/clearance contract. [Below DEVB Threshold]
DRAFT REVIEW
Lands Department
Slope Improvement and Emergency Works over Hong Kong Island and Islands, Kowloon, Sai Kung, Tsuen Wan and Kwai Tsing Districts
Repair, Maintenance and Demolition of Buildings and Associated Works on Land Reverted to Government / Vested in Financial Secretary Incorporated, and Street Lightings, Fire Services Installations and Other Facilities in Squatter Areas
Award date unconfirmed — LandsD works-contract page publishes no award-date column. Squatter-area building repair/maintenance/demolition term contract; scope includes street lighting + fire services installations. Government public-works award (LandsD).
DRAFT REVIEW
Lands Department
Lands Dept Term Contract — Demolition of Buildings/Structures and Clearance/Maintenance of Land, 2026-2027
13/LANDS/25
Tapbo Construction Company Limited
Unconfirmed
16,235,000
Verified
Not found
—
Award date unconfirmed — LandsD works-contract page has no award-date column (see 1/LANDS/25). Term demolition/clearance contract. [Below DEVB Threshold]
DRAFT REVIEW
DSD
Shek Kip Mei Stormwater Storage Scheme and Drainage Improvement Works in Eastern District and Lei Yue Mun
DC/2024/06
TBC — pending R1-R7 exhausted
TBC
—
Not Disclosed (banded/undisclosed)
Not found
—
Tender closed 2024-05-17; dedicated tender page now retired, award notice not located. Flooding vertical — confined-space storage-tank works. Works likely already underway/awarded (51-month duration from ~Aug 2024). Needs targeted follow-up next run.
DRAFT REVIEW
Water Supplies Department
Replacement of High Voltage Switchboard at Pak Kong Fresh Water Pumping Station
Contractor resolved via CEDD detail page (R2). Awarded Sum HK$35.33M. Commence Jul 2026, ~54 months. Fugro already active on GE/2025/26 (GI, HK$36.54M) — landslip vertical influencer/contractor. Ties to GEO AI Landslip Warning System programme.
DRAFT REVIEW
Water Supplies Department
Replacement of High Voltage Switchboard at Tuen Mun Fresh Water Pumping Station
3.6km/5m-dia stormwater drainage tunnel, Shau Kei Wan/Chai Wan to Pak Sha Wan; 7 intakes, 6 connection adits, outfall. ~46 months from Aug 2026, completion 2030. Designer/supervisor Binnies HK Ltd. JV partners to expand: China Road and Bridge Corporation (中國路橋), Bouygues Travaux Publics, VSL Hong Kong Limited. Found via TBC follow-up research 2026-09-07 (weekly_scrape.py DSD awarded-page scrape missed it — it is on the DSD What's New page, not yet the awarded-contracts listing).
DRAFT REVIEW
Civil Engineering and Development Department
Pilot Study on Application of Robotic Process Automation on Geotechnical Works Design Optimization and Verification – Feasibility Study
Contractor resolved via CEDD detail page (R2). Awarded Sum HK$689M. Commence Aug 2026, 42 months. JV partners: Sang Hing Civil Contractors Company Limited + Tapbo (Top Bo) — expand contacts for each. Large civil site formation / infrastructure works, Northern-Metropolis-adjacent (Tung Chung East reclamation).
DRAFT REVIEW
Civil Engineering and Development Department
Hung Shui Kiu/Ha Tsuen New Development Area Remaining Phase Development and Lau Fau Shan New Development Area Phase 1 Development – Design and Construction
Contractor resolved via R2 Playwright detail page (CEDD index-id-2398). Contractor address: 19/F, China Harbour Building, 370-374 King's Road, North Point — possible affiliation with China Harbour Engineering / CCCC group (unconfirmed); flag JV partners for manual verification before outreach.
DRAFT REVIEW
Water Supplies Department
Provision of Photovoltaic System at Au Tau Water Treatment Works
CST JV — registered address 29/F China Overseas Building, 139 Hennessy Road, Wan Chai = China State Construction / China Overseas group. Lead partner almost certainly China State Construction Engineering (Hong Kong) Ltd (CSHK) — Chinese SOE, PRIMARY target. Full JV partner breakdown not yet public (GLD award notice pending). D&C contract, commence Aug 2026, complete Q2 2030, ~86,000 sqm. Awarded Sum HK$7,433M.
DRAFT REVIEW
Water Supplies Department
Provision of Photovoltaic System at Lung Cheung Road M&E Workshop & Various Pumping Stations
DSD Integrated Delivery Partner (IDP) consultancy; brief as influencer
DRAFT REVIEW
Highways Department
Widening of Yuen Long Highway (Section between Lam Tei Quarry and Tong Yan San Tsuen Interchange)
HY/2025/13
Gammon Construction – Build King – Tung Lee Joint Venture
2026-06-26
1,366,490,000
Verified
Not found
—
Large civil >HK$500M. Contains Gammon Construction as JV partner — per standing rule, Gammon itself was NOT further researched; only inline award-page data reported. Research Build King and Tung Lee as JV partners. JV partners: Gammon Construction (standing exclusion — do not research further), Build King, Tung Lee.
DRAFT REVIEW
Highways Department
Lift and Pedestrian Walkway System between Lai King Hill Road and Lai Cho Road
HY/2024/02
Wing Hing Construction Company Limited
2026-06-26
129,939,000
Verified
Not found
—
Building works, HK$30M-500M band.
DRAFT REVIEW
Civil Engineering and Development Department
Landslip Prevention and Mitigation Programme, Ground Investigation Term Contract (2025-2028), Contract 9
Term Contract for Inspection, Repair, Overhaul and Testing of Electrical and Mechanical Installations at Various Sewage Treatment Works and Pumping Stations in New Territories West and New Territories North (2026-2029)
Official CEDD Contracts Awarded register; scheduled commencement June 2026
DRAFT REVIEW
Highways Department
Construction of Walkway Covers (Multiple Hospitals) + Wah Sing Street Escalator Link + Lift/Walkway (Lau Sin St - Tin Hau Temple Rd)
HY/2025/06
Grand View – Excel Joint Venture
2026-06-10
133,980,000
Verified
Not found
—
Building works, HK$30M-500M band. JV partners: Grand View, Excel.
DRAFT REVIEW
Architectural Services Department
Term contract for the design and construction of minor works to Government and subvented properties for which the Architectural Services Department is responsible [Contract Area: New Territories and Outlying Islands (North)]
Preventive Maintenance Programme of Roadside Man-made Slopes/Retaining Walls in New Territories (Package B)
09/HY/2025
Carrier Construction Limited
2026-06-02
141,630,000
Verified
Not found
—
Landslip vertical — slope/retaining-wall preventive maintenance. Sibling Package C (Fong On Construction, HY/2024/12) already tracked.
DRAFT REVIEW
Urban Renewal Authority
Structural, Civil & Geotechnical Engineering Consultancy — Site PU1&2, TKO Area 137
URA TKO137 (Civil Eng Consultancy)
Wilson and Associates Limited
2026-06
—
Not Disclosed (banded/undisclosed)
Not found
—
Day not disclosed (URA discloses month only). Consultancy; banded value M4 = 'Above HK$10m'.
DRAFT REVIEW
Environmental Protection Department
Sha Tin Transfer Station Third Follow-On Contract
EP/SP/307/24
Grandblue Canvest – Pekko Joint Venture
2026-06
1,497,957,000
Verified
Not found
—
Day not disclosed — EPD notice states 'Awarded in June 2026' only. 10-year DBO contract, HK$1.498B — large infrastructure with construction component. JV partners: Grandblue Canvest, Pekko.
DRAFT REVIEW
Urban Renewal Authority
Main Contract Works — 11-a-Side Soccer Pitch, Shing Fung Road, Kai Tak
URA YTM-013 (Works)
M4 Build King Civil Engineering Limited
2026-06
—
Not Disclosed (banded/undisclosed)
Not found
—
Day not disclosed. URA discloses only a banded value: M4 = 'Above HK$10m'.
DRAFT REVIEW
MTR Corporation
C3612 Provision of Radio Conversation Analysis System
ArchSD ca3m works-awarded JSON dataset; term contract design+construction of fitting-out works; Tier 03 Full Site Safety
DRAFT REVIEW
Architectural Services Department
Term contract for the design and construction of fitting-out works to buildings and lands and other properties for which the Architectural Services Department is Responsible (Designated contract area: Kowloon and New Territories)
[DRAFT REVIEW] Award month April 2026; exact day not published on summary page
DRAFT REVIEW
Urban Renewal Authority
Hoarding and Demolition Works — Kim Shin Lane/Fuk Wa Street
URA SSP-017 (Works)
M4 Wing Fat Building Construction Limited
2026-04
—
Not Disclosed (banded/undisclosed)
Not found
—
Day not disclosed (URA discloses month only). Banded value M4 = 'Above HK$10m'.
DRAFT REVIEW
Urban Renewal Authority
Comprehensive Consultancy Services — Site PU1&2, TKO Area 137
URA TKO137 (Comprehensive Consultancy)
LWK – ROCCO Joint Venture
2026-04
—
Not Disclosed (banded/undisclosed)
Not found
—
Day not disclosed (URA discloses month only). Consultancy; banded value M4 = 'Above HK$10m'. JV partners: LWK, ROCCO.
DRAFT REVIEW
Drainage Services Department
Term Contract for Inspection, Maintenance and Overhaul of Electrical and Mechanical Installation at Stonecutters Island Sewage Treatment Works (2025-2028)
HIGH — Chinese SOE (CRBC), HK$2.27bn, San Tin Technopole. Compliance: [BWVC Required] [Smoking Ban]. Chinese SOE — PRIMARY target; expand JV partners. JV — research each partner separately.
DRAFT REVIEW
Highways Department
Management, Operation, Installation and Maintenance of the Public Lighting System in Hong Kong Island and Islands (2026-2030)
24-month Term Contract for Air-conditioning and Electrical Installations at Ruttonjee Hospital, Tung Wah Eastern Hospital and Cheshire Home Chung Hom Kok
[DRAFT REVIEW] Award month February 2026; exact day not published on summary page
DRAFT REVIEW
Drainage Services Department
Term Contract for Overhaul, Maintenance, Testing and Plant Engineering Works at Sewage Treatment Facilities and Pumping Stations on Lantau and Outlying Islands
[DRAFT REVIEW] Award month January 2026; exact day not published on summary page
DRAFT REVIEW
Drainage Services Department
Term Contract for Inspection, Repair, Overhaul and Testing of Electrical and Mechanical Installations at Various Sewage Treatment Works and Pumping Stations in Sha Tin and Sai Kung (2026-2029)
Framework Contract for Drainage Maintenance and Construction in Hong Kong Island and Islands Districts (2026-2030) and Drainage Maintenance and Construction in Mainland North Districts (2027-2030) (Contract F3): Job Request No. JR04 – Regional Job Request for DCA/MN2
Framework Contract for Drainage Maintenance and Construction in Hong Kong Island and Islands Districts (2026-2030) and Drainage Maintenance and Construction in Mainland North Districts (2027-2030) (Contract F1): Job Request No. JR02 – Regional Job Request for DCA/MN1
DC/2025/01/F1/JR02
CRBC-FD Joint Venture (China Road and Bridge Corporation-Full Dragon C
Framework Contract for Drainage Maintenance and Construction in Hong Kong Island and Islands Districts (2026-2030) and Drainage Maintenance and Construction in Mainland North Districts (2027-2030) (Contract F3): Job Request No. JR01 – Regional Job Request for DCA/HKI1
Framework Contract for Drainage Maintenance and Construction in Hong Kong Island and Islands Districts (2026-2030) and Drainage Maintenance and Construction in Mainland North Districts (2027-2030) (Contract F2): Job Request No. JR03 – Regional Job Request for DCA/HKI2
DC/2025/01/F2/JR03
Welcome-Riseway Joint Venture (Welcome Construction Company Limited-Ri
HIGH — Chinese SOE JV (CCCC/CCECC/CR11G). Compliance: [BWVC Required] [Smoking Ban]. Chinese SOE — PRIMARY target; expand JV partners. JV — research each partner separately.
DRAFT REVIEW
Environmental Protection Department
Provision of Services for Operation and Promotion of Food Waste Recycling Spots in New Territories