ITN — HK AEC Project Pipeline

Infotronic Nexus International Ltd  ·  InfoSMART™ BD Intelligence  ·  02 Oct 2026
Projects (116) Contacts (24) Market Intel 🏔️💧
60
🏔️ Landslip Contracts
19
💧 Flooding Contracts
29
Open Leads
0
Upgrade Opportunities
Click rows to select · exports selection, or all visible if none selected 79 rows
Vertical Contract No. Contractor / JV Works Description Dept Value (HKD) Duration InfoSMART Tier BD Angle Lead Status Action
💧 Flooding DC/2024/06 TBC — award not located this run — DSD — — Tier 02 Infra & Tunnel — Open Lead
💧 Flooding DC/2025/01 CRBC-FD JV (CRBC + Full Dragon) / Welcome-Riseway JV / Shun Yuen Construction Framework Contract — Drainage Maintenance + Construction HK Island, Islands + Mainland North Districts (2026–2030) DSD HK$1,082,236,050 2026–2030 (4 yrs) Tier 04 Maintenance & Ops POWERPLAY: CRBC is Chinese SOE — primary target. Multi-site framework across HK Island + Islands. One InfoSMART across all DSD drainage sites Open Lead
💧 Flooding DC/2025/02 Riseway-Welcome JV / LCY–SCL JV (Sinohydro) Framework Contract — Drainage Maintenance + Construction Kowloon Districts (2026–2030) DSD HK$428,859,600 2026–2030 (4 yrs) Tier 04 Maintenance & Ops Sinohydro (Chinese SOE) in JV — research both partners. Kowloon drainage sites; confined space work in manholes + tunnels Open Lead
💧 Flooding DC/2026/01 Best Build Construction Company Limited Civil — Sewage Rising Main Improvement DSD HK$163,417,280 Aug 2026 – May 2029 (~33 mths) Tier 03 Full Site Safety Largest new DSD award this run — multi-district, ~33-month duration; confined-space entry risk on manhole/chamber works plus BWVC + smoking-ban compliance stack for a fresh public-works award Open Lead
💧 Flooding DC/2026/03 TBC — prequalification stage, no main contractor selected — DSD — — Tier 02 Infra & Tunnel — Open Lead
💧 Flooding DC/2026/04 CRBC – Bouygues TP – VSL (HKEDT) JV (China Road and Bridge Corporation / Bouygues Travaux Publics / VSL Hong Kong Limited) HK East Drainage Tunnel — 3.6km tunnel + 7 intakes, Shau Kei Wan to Pak Sha Wan DSD — Aug 2026 – Feb 2030 (46 mths) Tier 02 Infra & Tunnel FORECAST: Major tunnel contract. ~HK$bn scale. Confined space + flooding risk mandatory monitoring. Track winner and approach immediately on award Open Lead
💧 Flooding DE/2024/08 Hsin Chong Aster Building Services Limited DSD E&M Maintenance DSD HK$271,840,848 Jan 2026 – Active Tier 04 Maintenance & Ops Hsin Chong group — active across multiple DSD facilities Open Lead
💧 Flooding DE/2025/01 ATAL Engineering Limited Term Contract — E&M Inspection, Maintenance at Stonecutters Island STP (2025–2028) DSD HK$390,097,500 May 2026 – Apr 2028 Tier 04 Maintenance & Ops ATAL is repeat DSD contractor; E&M maintenance includes confined space pump rooms and wet wells Open Lead
💧 Flooding DE/2025/02 CEL-AEL JV (Chevalier Envirotech + Associated Engineers) Drainage E&M Term Contract DSD HK$387,031,693 2025–2028 Tier 04 Maintenance & Ops JV — research both Chevalier and Associated Engineers separately for contacts Open Lead
💧 Flooding DE/2025/03 ATAL Engineering Limited E&M — CHP Generating System Upgrade DSD HK$16,230,000 Aug 2026 – Nov 2027 (~15 mths) Tier 03 Full Site Safety E&M contractor on DSD treatment works site — same 4S-as-subcontractor angle as ATAL existing DE/2025/01 Stonecutters Island contract; below-threshold value but multi-site DSD relationship worth a combined pitch Open Lead
💧 Flooding DE/2025/05 Torishima (Hong Kong) Limited Upgrading — High Voltage Effluent Pumping at Sha Tin STP DSD HK$11,987,500 Apr 2026 – Active Tier 04 Maintenance & Ops Torishima is specialised pump contractor; E&M on DSD pumping stations; repeated contracts Open Lead
💧 Flooding DE/2025/07 Dunwell Engineering Company Limited — DSD — — Tier 04 Maintenance & Ops — Open Lead
💧 Flooding DE/2025/09 REC Engineering Company Limited — DSD — — Tier 04 Maintenance & Ops — Open Lead
💧 Flooding DE/2025/11 The Jardine Engineering Corporation, Limited DSD E&M Maintenance DSD HK$3,195,000 Apr 2026 – Active Tier 04 Maintenance & Ops Jardine Engineering active in both DSD and EMSD — brief once, reach multiple departments Open Lead
💧 Flooding DE/2026/05 REC-AEL JV (REC Engineering Company Limited – Associated Engineers, Limited Joint Venture) Term contract — inspection/repair/overhaul/testing of E&M installations at sewage treatment works and pumping stations DSD HK$390,770,866 9 Aug 2026 - 8 Aug 2029 Tier 04 Maintenance & Ops Recurring confined-space entry across multiple pumping stations and STWs — one dashboard, term-length engagement. Sibling contract to DE/2025/09 (REC Engineering, Sha Tin/Sai Kung) already tracked. Open Lead
💧 Flooding DE/2026/09 TBC — Tender closing Jul 2026 Term Contract — Waste Disposal + Minor Civil Works at Various STPs (2026–2029) DSD — 2026–2029 (3 yrs) Tier 04 Maintenance & Ops FORECAST: Multiple STP sites; open tender; approach winning contractor immediately Open Lead
💧 Flooding DSD-POWERCHINA-2026 POWERCHINA (China Power Construction) Framework Contract — Building + Civil Maintenance + Minor Works to DSD Plants + Facilities (2026–2030) DSD — 2026–2030 (4 yrs) Tier 04 Maintenance & Ops HIGHEST PRIORITY: Chinese SOE; signed Mar 2026; multi-facility framework across ALL DSD plants. One InfoSMART = massive rollout opportunity. Use Chinese name: 中國電力建設股份有限公司 Open Lead
💧 Flooding SS-KwunTong TBC — To be awarded Stormwater Storage Tank — Kwun Tong Hoi Bun Road Park DSD — ~2025–2028 Tier 02 Infra & Tunnel Same as Wong Tai Sin — underground confined space storage tank. Track tender award. Open Lead
💧 Flooding SS-WTSin TBC — To be awarded Stormwater Storage Tank + Drainage — Wong Tai Sin Morse Park (47,000 m³ tank) DSD — ~2025–2028 Tier 02 Infra & Tunnel Underground stormwater storage = confined space; water inrush risk. InfoSMART flood + gas alert essential Open Lead
🏔️ Landslip GE/2020/03 China Geo-Engineering Corporation — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2020/06 China Geo-Engineering Corporation — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2020/07 U-Win Const & Eng Co Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2020/19 Ming Hing Waterworks Engineering Co., Ltd — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2021/01 China Geo-Engineering Corporation — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2021/11 Royway Engineering Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2021/16 China Geo-Engineering Corporation — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2022/02 CM Geotechnics Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2022/05 Chi Wo Contractors Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2022/06 Kinli Civil Engineering Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2022/09 China Geo-Engineering Corporation — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2022/15 A-City Workshop Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2022/16 Geotech Engineering Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2022/22 Top Hill Civil Engineering Co., Ltd. — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2022/24 A-City Workshop Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2022/26 Ming Hing Waterworks Engineering Co., Ltd — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2023/02 Tysan Foundation Ltd — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2023/04 Ming Hing Waterworks Engineering Co., Ltd — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2023/09 Ming Hing Waterworks Engineering Co., Ltd — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2023/10 Ming Hing Waterworks Engineering Co., Ltd — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2023/12 Gold Ram Engineering & Development Ltd — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2023/14 Adrian Construction Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2023/16 Vibro (HK) Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2023/17 Geotechnics & Concrete Engineering (HK) Ltd — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2023/18 Adrian Construction Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2024/01 Adrian Construction Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2024/02 Ming Hing Waterworks Engineering Co., Ltd — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2024/03 Adrian Construction Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2024/04 Ming Hing Waterworks Engineering Co., Ltd — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2024/05 Adrian Construction Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2024/07 DrilTech Ground Engineering Ltd. — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2024/19 Tai Kam Construction Engineering Co., Ltd — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2024/21 A-City Workshop Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2025/02 Chi Wo Contractors Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2025/03 Ming Hing Waterworks Engineering Co., Ltd — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2025/05 Vibro (HK) Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2025/06 Gold Ram Engineering & Development Ltd — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2025/10 Adrian Construction Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2025/11 Adrian Construction Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2025/12 CM Geotechnics Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2025/13 Bachy Soletanche Group Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2025/14 Gold Ram Engineering & Development Ltd — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2025/22 Tai Kam Construction Engineering Co., Ltd — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2025/24 DrilTech Ground Engineering Ltd. Landslip Prevention and Mitigation Programme, Ground Investigation Term Contract (2025-2028), Contract 6 CEDD HK$30,520,000 15 June 2026 - 14 December 2029 Tier 01 Compliance Starter DEVB WTC No. 3/2023 mandates 4S on all capital works >HK$30M. InfoSMART slope monitoring integrates with CEDD's AI Landslip Warning System (deploying 2026). Open Lead
🏔️ Landslip GE/2025/29 Vibro (H.K.) Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip GE/2026/02 U-Win Const & Eng Co Limited — CEDD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip CE 16/2025 (GE) Halcrow China Limited LPM Consultancy — NTE + NTW Phase 1 Package B CEDD/GEO HK$30,030,000 Jan 2026 – Jan 2032 N/A (Consultant) INFLUENCER — Halcrow designs LPM works; can specify InfoSMART as monitoring requirement Open Lead
🏔️ Landslip CE 17/2025 (GE) Ove Arup & Partners Hong Kong Limited LPM Consultancy — HK Island + NTE Phase 1 Package A CEDD/GEO HK$27,802,500 Jan 2026 – Jan 2032 N/A (Consultant) INFLUENCER — Arup specifies monitoring systems in LPM design packages; brief on InfoSMART slope integration Open Lead
🏔️ Landslip CE 18/2025 (GE) Asia Infrastructure Solutions Limited LPM Consultancy — NTW + Lantau Phase 1 Package C CEDD/GEO HK$25,500,000 Mar 2026 – Mar 2032 N/A (Consultant) INFLUENCER — local firm; easier to engage; specify InfoSMART in design Open Lead
🏔️ Landslip CE 19/2025 (GE) AECOM Asia Company Limited LPM Consultancy — HK Island + Outlying Islands Phase 1 Package C CEDD/GEO HK$24,600,000 Mar 2026 – Mar 2031 N/A (Consultant) INFLUENCER — AECOM is global AEC firm; brief PMO + geotechnical team Open Lead
🏔️ Landslip GE/2024/10 Pan Kee Construction Limited LPM Works — NTE + NTW + OI Phase 1 Contract 1 CEDD/GEO HK$182,320,000 Jun 2025 – Jun 2028 Tier 01 Compliance Starter Pan Kee is repeat LPM contractor — multiple concurrent sites; one InfoSMART dashboard across all Open Lead
🏔️ Landslip GE/2024/11 U-Win Const & Eng Co Limited LPM Works — Kowloon + NTE Phase 1 Contract 3 CEDD/GEO — Sep 2025 – Mar 2029 (42 mths) Tier 01 Compliance Starter 30 slopes being upgraded — confined slope terrain; worker alert needed Open Lead
🏔️ Landslip GE/2025/19 Pan Kee Construction Limited LPM Works — slope upgrading CEDD/GEO — Jun 2025 – Jun 2028 Tier 01 Compliance Starter DEVB WTC 3/2023 applies; GEO increasing to 200 upgrades/yr; AI Warning System deploying 2026 Open Lead
🏔️ Landslip GE/2025/21 Tysan Foundation Limited LPM Works — slope upgrading CEDD/GEO — Active Tier 01 Compliance Starter DEVB mandate; multi-site monitoring with one dashboard Open Lead
🏔️ Landslip GE/2025/26 Fugro Geotechnical Services Limited LPM Ground Investigation CEDD/GEO HK$36,540,000 Active Tier 01 Compliance Starter Global geotech firm — brief as influencer; they specify monitoring requirements Open Lead
🏔️ Landslip GE/2025/27 Gold Ram Engineering & Development Limited LPM Works — slope upgrading CEDD/GEO — Active Tier 01 Compliance Starter DEVB mandate Open Lead
🏔️ Landslip GE/2026/12 A-City Workshop Limited LPM Works — slope upgrading CEDD/GEO — Active Tier 01 Compliance Starter DEVB mandate; smaller contractor — easier entry Open Lead
🏔️ Landslip ND/2025/04 Tysan Foundation Limited Ground Investigation — San Tin Technopole Phase 2 CEDD/GEO HK$27,500,000 Active Tier 01 Compliance Starter Northern Metropolis — high-priority development zone Open Lead
🏔️ Landslip 09/HY/2025 Carrier Construction Limited — HYD — — Tier 01 Compliance Starter — Open Lead
🏔️ Landslip HY/2024/12 Fong On Construction Limited Preventive Maintenance — Roadside Slopes/Retaining Walls Urban Region (Package C) Highways Dept HK$130,130,000 2026–2031 (5-yr term) Tier 04 Maintenance & Ops 5-year term contract; multiple roadside slope sites simultaneously; DEVB mandate applies Open Lead