Click rows to select · exports selection, or all visible if none selected79 rows
Vertical
Contract No.
Contractor / JV
Works Description
Dept
Value (HKD)
Duration
InfoSMART Tier
BD Angle
Lead Status
Action
💧 Flooding
DC/2024/06
TBC — award not located this run
—
DSD
—
—
Tier 02 Infra & Tunnel
—
Open Lead
💧 Flooding
DC/2025/01
CRBC-FD JV (CRBC + Full Dragon) / Welcome-Riseway JV / Shun Yuen Construction
Framework Contract — Drainage Maintenance + Construction HK Island, Islands + Mainland North Districts (2026–2030)
DSD
HK$1,082,236,050
2026–2030 (4 yrs)
Tier 04 Maintenance & Ops
POWERPLAY: CRBC is Chinese SOE — primary target. Multi-site framework across HK Island + Islands. One InfoSMART across all DSD drainage sites
Open Lead
💧 Flooding
DC/2025/02
Riseway-Welcome JV / LCY–SCL JV (Sinohydro)
Framework Contract — Drainage Maintenance + Construction Kowloon Districts (2026–2030)
DSD
HK$428,859,600
2026–2030 (4 yrs)
Tier 04 Maintenance & Ops
Sinohydro (Chinese SOE) in JV — research both partners. Kowloon drainage sites; confined space work in manholes + tunnels
Open Lead
💧 Flooding
DC/2026/01
Best Build Construction Company Limited
Civil — Sewage Rising Main Improvement
DSD
HK$163,417,280
Aug 2026 – May 2029 (~33 mths)
Tier 03 Full Site Safety
Largest new DSD award this run — multi-district, ~33-month duration; confined-space entry risk on manhole/chamber works plus BWVC + smoking-ban compliance stack for a fresh public-works award
Open Lead
💧 Flooding
DC/2026/03
TBC — prequalification stage, no main contractor selected
—
DSD
—
—
Tier 02 Infra & Tunnel
—
Open Lead
💧 Flooding
DC/2026/04
CRBC – Bouygues TP – VSL (HKEDT) JV (China Road and Bridge Corporation / Bouygues Travaux Publics / VSL Hong Kong Limited)
HK East Drainage Tunnel — 3.6km tunnel + 7 intakes, Shau Kei Wan to Pak Sha Wan
DSD
—
Aug 2026 – Feb 2030 (46 mths)
Tier 02 Infra & Tunnel
FORECAST: Major tunnel contract. ~HK$bn scale. Confined space + flooding risk mandatory monitoring. Track winner and approach immediately on award
Open Lead
💧 Flooding
DE/2024/08
Hsin Chong Aster Building Services Limited
DSD E&M Maintenance
DSD
HK$271,840,848
Jan 2026 – Active
Tier 04 Maintenance & Ops
Hsin Chong group — active across multiple DSD facilities
Open Lead
💧 Flooding
DE/2025/01
ATAL Engineering Limited
Term Contract — E&M Inspection, Maintenance at Stonecutters Island STP (2025–2028)
DSD
HK$390,097,500
May 2026 – Apr 2028
Tier 04 Maintenance & Ops
ATAL is repeat DSD contractor; E&M maintenance includes confined space pump rooms and wet wells
JV — research both Chevalier and Associated Engineers separately for contacts
Open Lead
💧 Flooding
DE/2025/03
ATAL Engineering Limited
E&M — CHP Generating System Upgrade
DSD
HK$16,230,000
Aug 2026 – Nov 2027 (~15 mths)
Tier 03 Full Site Safety
E&M contractor on DSD treatment works site — same 4S-as-subcontractor angle as ATAL existing DE/2025/01 Stonecutters Island contract; below-threshold value but multi-site DSD relationship worth a combined pitch
Open Lead
💧 Flooding
DE/2025/05
Torishima (Hong Kong) Limited
Upgrading — High Voltage Effluent Pumping at Sha Tin STP
DSD
HK$11,987,500
Apr 2026 – Active
Tier 04 Maintenance & Ops
Torishima is specialised pump contractor; E&M on DSD pumping stations; repeated contracts
Open Lead
💧 Flooding
DE/2025/07
Dunwell Engineering Company Limited
—
DSD
—
—
Tier 04 Maintenance & Ops
—
Open Lead
💧 Flooding
DE/2025/09
REC Engineering Company Limited
—
DSD
—
—
Tier 04 Maintenance & Ops
—
Open Lead
💧 Flooding
DE/2025/11
The Jardine Engineering Corporation, Limited
DSD E&M Maintenance
DSD
HK$3,195,000
Apr 2026 – Active
Tier 04 Maintenance & Ops
Jardine Engineering active in both DSD and EMSD — brief once, reach multiple departments
Term contract — inspection/repair/overhaul/testing of E&M installations at sewage treatment works and pumping stations
DSD
HK$390,770,866
9 Aug 2026 - 8 Aug 2029
Tier 04 Maintenance & Ops
Recurring confined-space entry across multiple pumping stations and STWs — one dashboard, term-length engagement. Sibling contract to DE/2025/09 (REC Engineering, Sha Tin/Sai Kung) already tracked.
Open Lead
💧 Flooding
DE/2026/09
TBC — Tender closing Jul 2026
Term Contract — Waste Disposal + Minor Civil Works at Various STPs (2026–2029)
DSD
—
2026–2029 (3 yrs)
Tier 04 Maintenance & Ops
FORECAST: Multiple STP sites; open tender; approach winning contractor immediately
Open Lead
💧 Flooding
DSD-POWERCHINA-2026
POWERCHINA (China Power Construction)
Framework Contract — Building + Civil Maintenance + Minor Works to DSD Plants + Facilities (2026–2030)
DSD
—
2026–2030 (4 yrs)
Tier 04 Maintenance & Ops
HIGHEST PRIORITY: Chinese SOE; signed Mar 2026; multi-facility framework across ALL DSD plants. One InfoSMART = massive rollout opportunity. Use Chinese name: 中國電力建設股份有限公司
Open Lead
💧 Flooding
SS-KwunTong
TBC — To be awarded
Stormwater Storage Tank — Kwun Tong Hoi Bun Road Park
DSD
—
~2025–2028
Tier 02 Infra & Tunnel
Same as Wong Tai Sin — underground confined space storage tank. Track tender award.
Open Lead
💧 Flooding
SS-WTSin
TBC — To be awarded
Stormwater Storage Tank + Drainage — Wong Tai Sin Morse Park (47,000 m³ tank)
DSD
—
~2025–2028
Tier 02 Infra & Tunnel
Underground stormwater storage = confined space; water inrush risk. InfoSMART flood + gas alert essential
Open Lead
🏔️ Landslip
GE/2020/03
China Geo-Engineering Corporation
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2020/06
China Geo-Engineering Corporation
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2020/07
U-Win Const & Eng Co Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2020/19
Ming Hing Waterworks Engineering Co., Ltd
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2021/01
China Geo-Engineering Corporation
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2021/11
Royway Engineering Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2021/16
China Geo-Engineering Corporation
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2022/02
CM Geotechnics Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2022/05
Chi Wo Contractors Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2022/06
Kinli Civil Engineering Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2022/09
China Geo-Engineering Corporation
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2022/15
A-City Workshop Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2022/16
Geotech Engineering Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2022/22
Top Hill Civil Engineering Co., Ltd.
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2022/24
A-City Workshop Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2022/26
Ming Hing Waterworks Engineering Co., Ltd
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2023/02
Tysan Foundation Ltd
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2023/04
Ming Hing Waterworks Engineering Co., Ltd
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2023/09
Ming Hing Waterworks Engineering Co., Ltd
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2023/10
Ming Hing Waterworks Engineering Co., Ltd
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2023/12
Gold Ram Engineering & Development Ltd
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2023/14
Adrian Construction Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2023/16
Vibro (HK) Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2023/17
Geotechnics & Concrete Engineering (HK) Ltd
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2023/18
Adrian Construction Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2024/01
Adrian Construction Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2024/02
Ming Hing Waterworks Engineering Co., Ltd
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2024/03
Adrian Construction Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2024/04
Ming Hing Waterworks Engineering Co., Ltd
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2024/05
Adrian Construction Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2024/07
DrilTech Ground Engineering Ltd.
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2024/19
Tai Kam Construction Engineering Co., Ltd
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2024/21
A-City Workshop Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2025/02
Chi Wo Contractors Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2025/03
Ming Hing Waterworks Engineering Co., Ltd
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2025/05
Vibro (HK) Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2025/06
Gold Ram Engineering & Development Ltd
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2025/10
Adrian Construction Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2025/11
Adrian Construction Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2025/12
CM Geotechnics Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2025/13
Bachy Soletanche Group Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2025/14
Gold Ram Engineering & Development Ltd
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2025/22
Tai Kam Construction Engineering Co., Ltd
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2025/24
DrilTech Ground Engineering Ltd.
Landslip Prevention and Mitigation Programme, Ground Investigation Term Contract (2025-2028), Contract 6
CEDD
HK$30,520,000
15 June 2026 - 14 December 2029
Tier 01 Compliance Starter
DEVB WTC No. 3/2023 mandates 4S on all capital works >HK$30M. InfoSMART slope monitoring integrates with CEDD's AI Landslip Warning System (deploying 2026).
Open Lead
🏔️ Landslip
GE/2025/29
Vibro (H.K.) Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
GE/2026/02
U-Win Const & Eng Co Limited
—
CEDD
—
—
Tier 01 Compliance Starter
—
Open Lead
🏔️ Landslip
CE 16/2025 (GE)
Halcrow China Limited
LPM Consultancy — NTE + NTW Phase 1 Package B
CEDD/GEO
HK$30,030,000
Jan 2026 – Jan 2032
N/A (Consultant)
INFLUENCER — Halcrow designs LPM works; can specify InfoSMART as monitoring requirement
Open Lead
🏔️ Landslip
CE 17/2025 (GE)
Ove Arup & Partners Hong Kong Limited
LPM Consultancy — HK Island + NTE Phase 1 Package A
CEDD/GEO
HK$27,802,500
Jan 2026 – Jan 2032
N/A (Consultant)
INFLUENCER — Arup specifies monitoring systems in LPM design packages; brief on InfoSMART slope integration
Open Lead
🏔️ Landslip
CE 18/2025 (GE)
Asia Infrastructure Solutions Limited
LPM Consultancy — NTW + Lantau Phase 1 Package C
CEDD/GEO
HK$25,500,000
Mar 2026 – Mar 2032
N/A (Consultant)
INFLUENCER — local firm; easier to engage; specify InfoSMART in design
Open Lead
🏔️ Landslip
CE 19/2025 (GE)
AECOM Asia Company Limited
LPM Consultancy — HK Island + Outlying Islands Phase 1 Package C
CEDD/GEO
HK$24,600,000
Mar 2026 – Mar 2031
N/A (Consultant)
INFLUENCER — AECOM is global AEC firm; brief PMO + geotechnical team
Open Lead
🏔️ Landslip
GE/2024/10
Pan Kee Construction Limited
LPM Works — NTE + NTW + OI Phase 1 Contract 1
CEDD/GEO
HK$182,320,000
Jun 2025 – Jun 2028
Tier 01 Compliance Starter
Pan Kee is repeat LPM contractor — multiple concurrent sites; one InfoSMART dashboard across all